Los Rios CCD FacilitySoft

Active Projects Work Load - Projects per PM

PM Project Status
DOC Test Contractor Delete Issue Project In Design
Besne ARC NEC Phase II & III In Const
Blake CRC EGC Phase II In Const
Blake SCC Swing Space Portable Removal In Design
Blake CRC Hawk Cares Health and Wellness Mod In Design
Blake ARC 2025 BSO Office Remodel In Design
Blake SCC PAC Main Speaker Replacement In Design
Blake ARC 2025 Natomas Key and Card Access Upgrade In Design
Blake ARC Davies Hall Modernization In Design
Meyer SCC Sand Volleyball In Design
Meyer SCC 2025 Bookstore Renovation In Design
Meyer ARC 2026 Snack Bars In Design
Meyer DOC District Wide Infrastructure Master Planning In Design
Meyer FLC Rancho Center Health Hub Project In Design
Meyer ARC Tech Ed Modernization In Const
Meyer SCC Security Improvement Project - Phase 1 Hardware/Cylinders/Keys Close-out
Meyer DOC DO Bond Admin In Const
Meyer FLC Central Plant Upgrades In Const
Meyer ARC Tech Ed Temp Housing In Const
Mirmiran FLC 2026 Innovation Center In Design
Mirmiran SCC Child Development Center Shade Structure In Design
Mirmiran CRC Affordable Student Housing In Design
Mirmiran SCC 2024 Quad Lighting In Design
SixthDimension FLC Science 2.1 In Const
Uhlmeyer ARC NEC TAP II & III Offsite Parking In Const
Uhlmeyer ARC Portable Village 1 & 2 Refresh In Design
Uhlmeyer SCC SCC South Loop Chiller Replacement (SMSR) In Const
Uhlmeyer DOC Synthetic Field Turf Replacement, FLC, SCC In Const
Uhlmeyer CRC CRC Electrical Switch Gear Replacement (SMSR) In Const
Uhlmeyer ARC Veterans Resource Center In Design
Uhlmeyer DOC LRPD Move to FM In Design
Uhlmeyer SCC Astroturf Synthetic Softball Field In Const
Uhlmeyer FLC Rancho Cordova Phase 2 Parking In Const
Uhlmeyer CRC 2025 Central Plant Upgrade In Design
Uhlmeyer ARC 2025 Child Development Center Shade Structure In Design
Uhlmeyer CRC 2025 Stadium Synthetic Turf Replacement In Design
Uhlmeyer CRC 2025 Grounds Relocation In Design
Uhlmeyer ARC 2025 Softball Scoreboard Replacement In Design